Inamdar Purva Sarang

5159

MANHOLE

The project includes quantity analysis, rate analysis, and drawings or the considered size of manhole


Report Content

Tittle

plan

section

Quantity for earthwork

quantity for brickwork

Quantity for formwork

Rate analysis

Rate analysis

abstract sheet(for final cost)

abstract sheet(for final cost)