• Home
  • FT
  • 5734
  • CONSTRUCTION OF ELEVATED METRO STATIONS FOR MEGA

Yatin Wadhwa

5734

CONSTRUCTION OF ELEVATED METRO STATIONS FOR MEGA

The project consists of Construction of Five Elevated metro stations between Ranip and Motera region of Ahmedabad. The project is recognised under the Metro Act, 2002. The studio work basically focuses on the aspects of construction execution such as Planning and Scheduling, Quality Management, Safety Management, Equipment Management, etc. The studio also dealt with the use of Project Planning software Primavera P6. Along with the construction execution, project monitoring and control was also a part of this studio focusing on aspects such as cost control using Earned Value Management and Value Stream Mapping.


Report Content

Introduction and General details of the project

Framework for the construction of Metro Projects in India and the Timeline involved in Ahmedabad Metro Construction

BIM - Levels of Development

Levels of Schedule

Insurance Policies opted by the contractor

Store and Quality Lab Layouts at the Casting Yard

Pareto Analysis for the reasons of Non-Conformances

Safety Management Plan

Primavera Risk Analysis

Primavera Risk Analysis results and Conclusions