Doshi Aditya Pragneshkumar

5146

CONSTRUCTION TECHNOLOGY 1

The project is a compilation of my work done, observations made on site and my understanding of the methods of construction used on site.The course gave me a basic knowledge and understanding of the work done on the construction site. I did a detailed study on the construction methods which included analyzing the labor cost, labor distribution, labor productivity, material usage, material wastage and material cost.I visited the site for a duration of 6-8 hrs , once or twice a week , over a period of almost 4 months.


Report Content

poster 1

poster 2

poster 3

page 1

page 2

page 3

page 4

page 5

page 6

page 7