construction technology II~ FORMWORK OF LIFT SHAFT 1. PROCEDURE AND LOADTRANSFERMECHNISM ~ ENOUGH OF MATERIAL AND LABOUR IS MADE AVALIABLE ON SITE
MATERIAL SHOULD BE PROPERLY CHECKED BEFORE USE
ONCE ~ THESE PRE-REQUISITE ARE DONE THE BOTTOM MOST PART OF LIFT IS ERRECTED ~ SO AS SO TO GIVE SUPPORT TO OTHER SIDES AS WELL AS TO MAKE IT MORE CONVINIENT TO WORK ~ 0NCE BOTTOM FORMWORK IS DONE A GRID OF SIDE ~ FORMWORK IS MADE AND THEN ERECTED VERTICALLY ~ AFTER COMPLECTION OF REINFORCEMENT THE EXTERNAL SIDED ARE ERECTEDIN SIMILLAR FUNCTION . ~ THEN UPTO LOAD TRANSFER MECHANISM