Dave Madhav Manojkumar

5123

CT 2 PORTFOLIO

Form work of the elements and their required quantities are showed below ,Form work of staircase ,form work of retaining wall ,form work of lift wall are showed . In which procedure ,methodology,process,quantity ,labor productivity,sketch, material cost ,total cost,unit cost ,temporary load transfer mechanism ,permanent load transfer mechanism ,plan elevation ,section ,checklists are calculated in the report . we are very grateful that prof Reshma shah and prof Bhargav trivedi helped us and guided us .we also thank to the contractors and jr site engineer and Sr site engineer to help us whenever we were in need .
MADHAV DAVE UC1416


Report Content

INTRODUCTION

PLAN ELEVATION

CHECKLIST PROCEDURE

PLAN SECTION

ELEVATIONAL SECTION

MATERIAL DETAILS LABOUR DETAILS

METHODOLOGY PRODUCTIVITY

PLAN SECTINAL ELEVATION

CHECKLIST METHODOLOGY

CALCULATION