• Home
  • FT
  • 5739
  • Design Studio-2 : High-rise buildings

Balar Tanay Hareshbhai

5739

Design Studio-2 : High-rise buildings

ROJECT DETAIL: project- G+10 Residential building,Surat
Exposure – Moderate
 Features- Open ground for parking ,Masonry Unit- AAC blocks Specific problem:  Torsion control in building.* Problems due to eccentric location of shear wall and problems arising due to it.* Check whether building is torsionally irregular or not as Per IS 1893 :2016* Putting shear wall at Suitable location so that torsion in building comes under control


Report Content

Design Studio-2

Problem statement

Initial Structure system

Base shear & Load calculation

Behavior of structure under EQx force.(torsion induced)

Reason of Torsion in building is difference between center of mass and stiffness.

Possible location of additional shear wall.

changing of eccentricity due to additional shear walls.

changing of eccentricity due to additional shear walls.

building is torsionally regular as New shear walls is added.