Kathan Chauhan

IR2030

Dynamic Cycle track, Sabarmati riverfront

A dynamic cycle track is been proposed on the Sabarmati riverfront from Sardar bridge to Ellis bridge. To change the cycling experience at Sabarmati riverfront from monotone exposure of either seeing a grey 6 m high wall or the river. The project focuses on reusing the existing cycling path and creating a multi functional spaces. Every week user will interact with different heights of the track making the spaces underneath function partially differently. The project will increase the frequency of visits by the localities.


Report Content

Site analysis

Concept sketches

Plans and Sections

Final design

Working Drawing

Model and Joineries