After quenching cooling boiler made of steel section analyzed and designed including loads of all equipment while operating or not as well as all lateral loads (wind and earthquake).Structure is provided with Vertical and Planer Bracing. Structure consist of critical load at 45m and 54.5m. 3-Compartment Silo made of R.C.C. analyzed and designed including load of 3 different material stored in silo while compartment empty or filled as well as lateral loads up to base slab of Silo. Chimney made of R.C.C. analyzed and designed including temperature loads, vertical loads and lateral loads (Wind+Earthquake) provided with Insulating Material and space of air ventilation.


Report Content

After Quenching Cooling Boiler Introduction

After Quenching Cooling Boiler Load Calculation

After Quenching Cooling Boiler Section Design

After Quenching Cooling Boiler Base Plate Design

After Quenching Cooling Boiler Detailing

After Quenching Cooling Boiler Detailing

3-Compartment Silo Detailing

3-Compartment Silo Detailing

3-Compartment Silo Detailing

Chimney Detailing