  • BIM & Lean implementation on a Hostel Building project

Shah Raj Jayesh

CM4001

BIM & Lean implementation on a Hostel Building project

This studio - Integrated Construction Practices attempts to simulate the process of Integrated Project Delivery, Lean Tools, Global Collaboration using appropriate software tools that were applied to the Hostel Building Project. Building Information Modelling, Global Collaboration & Integrated Project Delivery are recent trends in the construction industry.  Softwares like Revit , Microsoft Project, Navisworks were used to achieve Scheduling, quantity take-off, clash detection with the big room concept. 


Report Content

Basics of Integrated Project Delivery through Pilot Project

Project Planning & Scheduling assumptions for the 4D Simulation

4D Simulation in Naviswork Manage

Minutes of Meeting Format prepared as a part of BIM Execution Plan

Site Layout prepared in Revit for logistical analysis

Application of Last Planner System on site

Cost Take-off from the Revit

Functional Value Engineering for Sand

Model accuracy check through Revit V/s Manual calculations

Clash Detection Solutions after performing it in Naviswork Manage