Jaimin Naresh Bali

UR2007

Integrating edge with Built Form

1. The design focuses on the development which will be taking place in next 10 to 15 years and as per the tp scheme, road widening is proposed in the Thaltej gaam area because of the metro rail line. 2. Due to the metro line, the development plan shows the redevelopment in 200 m buffer from the metro line towards each side, which includes gaamthal. 3. As the guidelines are not followed in gaamthal so, in order to keep the same fabric and to provide basic infrastructure in the gaamthal region according to the current situation of lack of integration of edges and built, new built form guidelines are proposed. 4. This project gives the guidelines to change built form of the first layer of buildings from the street, which does not completely change the gaamthal fabric and also supports the new fabric, which can be used during the development of this area in next 10 to 15 years.


Report Content

Transect

Site Analysis

Site analysis

Existing Conditions

Design- Master Plan

Design- Detail Plan

Design- Sections and view