Mayank Jain

CT3000

Extradosed bridge over barapullah phase 3

The project training was done at Extradosed bridge over barapullah phase 3 bridge over yamuna river. It connects mayur vihar phase 3.  Phase 3 of the Barapullah Elevated Road will connect Mayur Vihar-I and Sarai Kale Khan. It will cut travel time between east and south Delhi to 20 minutes. In project training we had done study of detailed construction methodology, time cycle analysis , rate analysis , labout productivity and cost analysis etc . At the end of the semested final report was prepared for elements including pier, piercap, segment erection by both method underslung and launching girder and casting yard. 


Report Content

Project details

Site alignment

Status of site

Project timeline details

Cost breakdown of project

Activity introduction

Underslung assembly

Erection of last segment

Cost analysis