Construction of elevated viaduct from Thaltej Gaam to end of western ramp in east west corridor including bridge over Sabarmati river and 7 stations. The study includes various aspects of Sabarmati metro river bridge construction. The focus is on developing an understanding of method of construction, use of tools- equipment and plants, productivity and other management aspects.


Report Content

project introduction

alignment drawing

load transfer mechanism

island formation

Sabarmati island job layout

pile-cap procedure sketch

pile cap procedure sketch

pour details

cost distribution of pile-cap works

time cycle analysis of pile cap