• Home
  • FT
  • CT3000
  • Construction of 6-Lane FOB along S.P. Ring Road

Kadia Maitri Jagdishbhai

CT3000

Construction of 6-Lane FOB along S.P. Ring Road

The Sardar Patel (SP) Ring Road was conceptualized in the Revised Development Plan of 2011 of AUDA. A 76.3 km road was planned around the developing areas of Ahmedabad to strengthen the existing road network within the city. On average, per month 4 lakh vehicles use this road. As per an estimate, there shall be a 25% addition to this once the ring road is converted to six-lane. The 60mt wide ring road was conceptualized to reduce traffic congestion on peripheral roads segregate regional and urban traffic increase connectivity guide the development and expansion of Ahmedabad in a larger region.


Report Content

General Alignment Drawing and plan profile of the bridge

Basic information about the PSC-I Girder

Girder half plan & elevation, Bearing details, pedestal details & Sesmic restrainer details

Un-tensioned Reinforcement details & Cable details (for tension strands

Procedure for the Pre-cast girder

Procedure & Form-work Details for the Pre-cast girder

Form-work elements details

Stressing details

Analysis of the time cycle for the whole activity, along with the productivity analysis of the man-power deployed for the activity. Also, the Cost Analysis for the different activities and the total cost derived for the one girder, along with the derivation of the ratios.

It gives the details of the comparison of the different kind of girder