Gajjar Abhishek Sanjaykumar

CT3000

Mumbai Trans Harbour Link - Package 3

Mumbai Trans Harbour Link -Package 3 (MTHL_P3) is an EPC-Design & Built based construction project of 3.613 km long viaduct section that includes construction of ramps & interchange that connects national & state highways. MTHL is connecting Mumbai to Navi Mumbai by construction of 21.8 km long sea link bridge. The project is sub-divided in packages. Package 1 is inter-tidal and marine construction, package-2 is solely marine construction and package-3 is solely construction on land.I have been interning with AECOM Asia Company Ltd. which is a general consultant for the project. 


Report Content

Location of project

Preliminary details of project

Contour plan of site location

Alignment and profile

Project introductory details

Project Breakdown Structure & SHE Management system

Casting yard layout

General Alignment Drawing of project site

Procedure for construction of Open foundation

Procedure for construction of Pier cap