Vishakha Dhanraj Umate

CM4001

HIGH RISE RESIDENTIAL PROJECT

The studio Integrated Construction Practices focusses on exploring several BIM functionalities and Lean principles through a collaborative working approach. BIM execution plan was made and the stakeholders were brought together in a common data environment like BIM 360 for simultaneous modelling. Clash detection, clash quantification, and rule based checking, visual checking of model, design optimization, quantity take-off and cost estimation have been performed. LPS and other lean tools have been implemented for both the design and site execution process for a certain period which enabled continuous improvement in planning. For the same the Project selected was High rise Residential tower in GIFT City Gandhi Nagar.To meet the Objectives various tools such as BIM360, MIro boards, Google platforms, Visilean, Naviswork, Synchro, Revit  and Plannerly were being used.  


Report Content

Project Introduction

BIM Execution Plan

Collaboration & Information Management

Architecture Modeling

Architecture Quantity take off

Quality Control

Site Modeling

Site Optimization

Studio Process

Key learning

Project Video