A PHP Error was encountered

Severity: Notice

Message: Undefined offset: 0

Filename: models/Project_model.php

Line Number: 80

Backtrace:

File: /home/portfolio/public_html/application/models/Project_model.php
Line: 80
Function: _error_handler

File: /home/portfolio/public_html/application/models/Project_model.php
Line: 709
Function: get_sem_info

File: /home/portfolio/public_html/application/controllers/Project.php
Line: 112
Function: get_project_detail

File: /home/portfolio/public_html/index.php
Line: 321
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined offset: 0

Filename: models/Project_model.php

Line Number: 80

Backtrace:

File: /home/portfolio/public_html/application/models/Project_model.php
Line: 80
Function: _error_handler

File: /home/portfolio/public_html/application/models/Project_model.php
Line: 800
Function: get_sem_info

File: /home/portfolio/public_html/application/controllers/Project.php
Line: 127
Function: increase_project_view

File: /home/portfolio/public_html/index.php
Line: 321
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined offset: 0

Filename: models/Project_model.php

Line Number: 80

Backtrace:

File: /home/portfolio/public_html/application/models/Project_model.php
Line: 80
Function: _error_handler

File: /home/portfolio/public_html/application/helpers/utility_helper.php
Line: 131
Function: get_sem_info

File: /home/portfolio/public_html/application/views/includes/header.php
Line: 9
Function: semester_info

File: /home/portfolio/public_html/application/controllers/Project.php
Line: 148
Function: view

File: /home/portfolio/public_html/index.php
Line: 321
Function: require_once

COMMERCIAL PROJECT | CEPT - Portfolio

Ahir Hitesh Lalji

CM4001

COMMERCIAL PROJECT

The Master of Construction Engineering and Management program's Integrated Construction Practices studio, which is part of Monsoon Semester III, focuses on practical procedures and teamwork with the use of appropriate software. To meet the problems of contemporary building projects, the latest developments in Building Information Modelling (BIM), Integrated Project Delivery (IPD), and Lean building are employed. This studio has chosen a commercial project. To understand the shortcomings of conventional building methods and the role technology plays in construction management, each group member simulated a major project stakeholder position in the chosen project.


Report Content

Project Brief

Stakeholder Roles & Responsibilities and Collaboration Platforms (BEP)

Risk Assessment (BEP)

LOD vs LOS (BEP)

Site Layout Optimization-POT Analysis

Project 3D Modelling-Structure Model

Project 3D Modelling-Plumbing & Firefighting Model

4D Simulation

Integrated Project Delivery (IPD) vs Traditional Approach

Conclusions & Key learnings

Project Video