The project aims to design an energy-efficient building in Kolkata's warm and humid climate using the ECBC framework and Design Builder software. A base case model had an EPI of 111.22 kWh/m²/year. Optimization through the building envelope, HVAC systems, and mixed-mode schedules reduced the EPI to 75 kWh/m²/year. Renewable energy integration achieved a 38% electricity offset, by using the entire rooftop area. The final EPI after renewable integration was 41.28 kWh/m²/year, a 74% reduction from the base case. The payback period for the final design is about 16 years, whereas, for renewables alone, it is approximately 1.9 years.


Report Content

Project details and methodology followed

Climate analysis of Kolkata city

ECBC standard case analysis

Envelope Optimization of the building

Daylight analysis of the building

Mixed-mode operation and HVAC schedule

HVAC System Selection

Optimized HVAC system with mixed-mode operation

Renewables integration and life cycle assessment (A1-A3 stages)

Executive summary of the building