• Home
  • FA
  • AR3025
  • ANTICIPATE - Revitalizing the largest lake in Jaisalmer

Sampreet Dasgupta

AR3025

ANTICIPATE - Revitalizing the largest lake in Jaisalmer

With the rise in global warming, water bodies are drying up all around the world which can create severe water shortages in several parts of the world especially in arid and dry regions. One can ANTICIPATE that India as a developing country could face unprecedented problems in the desert regions of Gujarat and Rajasthan. 
The intention is to create an architectural solution that takes this water crisis into consideration, develops methods for proper storage, treatment and maintenance of water, and prepares the inhabitants in advance if such a situation were to occur. For a detailed portfolio,  click on the link.

View Additional Work

Report Content

Word thought

Site and Brief

Site study

Development process

Final proposal

Water Catchments

Catchemnts and Baori (Linear stepwell)

Linear stepwell

Treatment of Gadisar water

Water circulation, redirection via swales and simulations