Swayamsiddh Dash

UR2014

Khorakha Laari

The project is integrated upon the ideas of mobile infrastructure, where in a easily acquired tempo is modified to act as a a food distribution and supply vehicle, with one side of it acting for food distribution and the other side acting as a area where the people can sit down and be educated about the various requirements for nutrition in their daily lives,There is a beauty in the way the project folds up into a tight and sophisticated box when not in use so that it can be transported from one site to the other, thus using mobile infrastructure,

View Additional Work

Report Content

A detailed catalogue of the kit of parts that are required for the construction the laari.

A stage by stage representation of the deployment process of the laari.

The framework and the way by which it is joined is visually explained in this sheet.

The infills require framework, and in this case, deployable framework is needed, hence, the construction process is shown.

The framework that was created is then attached with infills, which is shown in this sheet

The roofing of the laari and how it would be joined is presented in this sheet.

The project required custom furniture for the size requirements and hence the construction process of the bench is shown.

As the construction the base is custom, it also has a specialized joinery, explained in this page.

The plan of the laari shows how the people would interact with the structure when it is opened up.

The section of the laari shows a side view of how the people will interact with the laari in a side view.