The studio exercise was to make a detailed project report for inner ring road of Surat city. An alternative analysis was done to select PT mode for the ring road. Then two modes were finalized and further DPR was prepared for each. 


Report Content

Technical feasibility of Metro

Proposed Metro alignment

Infrastructure Design

Alignment rationalization

Station location and design

Detailed design of station

Detailed design of station

Junction design