The studio task was to prepare the Detailed Project Report for public transport systems for which we initially started with multiple options for public transport and eventually centering on LRT and BRTS. It involved doing the feasibility, demand, infrastructure, economic, financial analysis of the transport system in addition to operational plan and fare strategy. Two groups in the class did LRT and BRTS separately after collectively establish the primary surveys and analysis.


Report Content

Monorail-Case Studies

Monorail-Feasibility

Monorail-Design Feasibility

Multi-Modal Transport Hub, Surat

BRTS Infrastructure

BRTS Infrastructure

Junction Design

Sections

Junction Design

ITMS-Study