Bhumika Rajendra Raj

CT2006

ADVANCED QUANTITY SURVEYING AND VALUATION

This studio focused on finding the total quantity of the projects taken by students along with the total cost of the project.it helped in getting an idea about the estimated material that can be used on site by not even visiting the site.in the end, we derived the ratios of formwork to concrete, etc. In a nutshell, this subject has helped us evolve our skills in finding quantity with precision along with giving us an insight into how the bill of quantities is prepared which will surely help us ahead in professional life.


Report Content

The above poster shows the total per metre cost for formwork,concreting,reinforcement of a sloping roof,water treatment and roof cladding cost and process is shown through sketches.

INTRODUCTION

RECAPITULATION SHEET

ELEEMNT WISE RATIOS

PLANS

MISCALLANEOUS WORK DETAIL(SLOPING ROOF)

MISCALLANEOUS WORK DETAIL(SLOPING ROOF)

COST PER METRE SQUARE(SLOPING ROOF)