We have visited a load bearing site Radhe Greens at Sanand. The activity which we described in our poster is formwork of column. The bungalow in which this activity is seen is bungalow number 18. The top left part shoes the structural drawing of the columns. There were three types of columns:1. SC columns2. C1F1 columns 3. C2F2 columns
C1F1 and C2F2 columns are the footing columns.Section and elevations of these columns are shown along with the procedure of the formwork of column.The bottom right part of the part shows the job layout of the site for this activity.