Harsh Agarwal

CT2024

Geotechnical Parameters

As a part of geotechnical engineering, it is crucial to analyze and design isolated footing, raft foundation, and pile foundation according to the proposed structure using a bore log. A total of 5 bore logs were used for a foot-over bridge with low load intensity, a silo with medium load intensity, and a river bridge with high load intensity. For borehole 1, on-site work was conducted in a village near Becharaji, Mehsana, soil was collected, tested in the laboratory, and analyzed to identify the layers of soil at various depths. Data for the other four bore log reports was assigned by the studio.

View Additional Work

Report Content

Site Investigation

Laboratory Tests

Soil Improvement

Soil Profile

Load Case 1

Load Case 2

Load Case 3

Physical Model

Project Video