HIGH RISE RESIDENTIAL BUILDING PROJECT

The studio is regarding the study of Integrated Construction Practices. In this studio, we studied digital construction practices of the residential building and hands-on experience with collaboration tools and software. The study involves specific processes to be followed according to BIM standards and measuring the weekly progress of the same. The topics covered here are-Project Introduction, Structural Consultant Process Map, Model Sequence, Challenges faced with solutions, Clash Detection-Quantification, Cost-Benefit Analysis, Quantity Takeoff, and Difference between Traditional vs IPD Approach. This studio helped us to monitor the collaborative process to be followed for integrated project delivery with the use of technology.

View Additional Work

Report Content

Project Introduction and Structural Consultant Process Map

Structural LOD 300 Model Sequence

Challenges faced and solutions

Clash Detection

Clash Quantification

Cost Benefit Analysis- Formwork

Quantity Takeoff

Quantity Takeoff

Quantity Takeoff- Comparative Study

Traditional vs IPD Approach