• Home
  • FT
  • CT2019
  • Planning & Design of Road Infrastructure in Hilly Region

Chowatia Abhishek Atulkumar

CT2019

Planning & Design of Road Infrastructure in Hilly Region

The studio objective is to learn principle and provisions for planning and designing of a suitable road in hilly region. Studio also enables for Advanced Surveying & Mapping, Testing of soil and materials, Pavement design and Geometric design. Firstly we have worked on existing alignment connecting Taranga temple with state highway-56 and then we have learned about the surveys and moving on to make the alternative proposed alignment for the same. In the studio we have explored many software's and learn many new concepts and skills. Click here for Portfolio & Report.

View Additional Work

Report Content

Overview

Mind mapping

LULC & Reconnaisance Survey

GAD of Existing Route

Test, Typical Cross section & Pavement design

Proposed alignment

Calculation and Drawing detail

GAD Proposed Alignment

Drainage Design

Cost, Analysis & Review