PROJECT : SIGNATURE BRIDGE, WAZIRABAAD, DELHI

The objective of commissioning is to provide documented confirmation that the scope of work of the project has been fulfilled to its at most requirement. To reach this goal, it is necessary for the commissioning process to establish and document the CPWD criteria for system function, performance, and maintainability; as well as to verify and document compliance with these criteria throughout design, construction, and the operation. For the process to work successfully, it is important that the DTTDC, commissioning provider, design team, Gammon, and operators work together as a team throughout their involvement with the project. Contractor shall pre?commission, commission and carry out the Performance Tests on the Works listed in Description of Works in the Bid Package.