• Home
  • FT
  • 5113
  • Signature Bridge-Develoopment stage

Parmar Harsh M

5113

Signature Bridge-Develoopment stage

Due to tremendous increase in population of Trans Yamuna Area, there was a pressing demand for additional East-West corridors over River Yamuna. There is a proposal to construct a new eight lane bridge across river Yamuna 600 m downstream of existing barrage cum bridge at Wazirabad, Delhi. The proposed bridge will connect marginal bund road at Khajuri Khas intersection on Eastern side and Road No.45 (Outer Ring Road) on the Western side. The provisions of flyovers, ramps, loops etc have been incorporated in the scheme to ensure signal free traffic movement. The scheme is proposed to be implemented in two packages, one for Main Bridge (Cable Stayed Bridge) and another for Approaches.


Report Content

Title slide

Introduction

GAD

Schematic explanation

Development

Eligibility criteria

Bid capacity criteria

Financial and work experience forms

Billing details

BOQ