• Home
  • FT
  • CT3000
  • Ahmedabad Metro Reach-2 (Thaltej to west ramp)

Aastha Shah

CT3000

Ahmedabad Metro Reach-2 (Thaltej to west ramp)

The project training was done at Elevated Metro project Ahmedabad Metro Reach-2 (Thaltej to west Ramp) under the guidance of contractor Tata Projects Limited(CCECC TPL JV). The project training encompassed the study of construction Methodology, Cost Analysis, Time Cycle Analysis, Technology adopted, etc. At the end of the semester, a concise project report was prepared for station elements namely Pile, pile Cap, Pier, Pier Arm, and I-girder. This portfolio comprises the details related to overall Project, Cost Breakdown, Pier and I-Girder casting and Erection, etc.


Report Content

Cover Page

Project Introduction

Major project Quantities

Job Layout-Bhadaj Casting Yard

Casting yard layout Sabarmati

Procedure Sketch-Pier

Procedure Sketch-I Girder

Job Layout-I girder erection

Procedure Sketch-I-Girder Erection

SWOT Analysis