Patel Madhav J

CT3000

BRIDGE ACROSS NARMADA RIVER CTP - 15 B

The project training at Special Steel Rail Bridge Across Narmada River at Bharuch. The Longest Rail Bridge in Western Dedicate Freight Corridor Delhi-Mumbai  Line. The Bridge Length is 1.796 km and 29 no. Span(48.15m). The Bridge is Well Foundation Type Construction. During Training Cofferdam, Well Curb, Well Steining, Well Cap Activity Observed.  Training also Carried out the study of construction Methodology, Cost Analysis, Time Cycle Analysis. The Project is Constructed by IIS-L&T Consortium and Overlooked by Dedicated Freight Corridor Corporation of India Ltd.  


Report Content

Introduction: Brief About The Project and Salient Features of Project

Project Timeline , Project Family Tree, Project Work Breakdown Structure

Construction Methodology : Well Foundation

Detailed Well Foundation-Abutment Section

Material Transportation in River Section

Well Steining Construction Methodology Reinforcement Work

Form work Detail of Well Cap

Well Cap Formwork- Concreting Construction Sequence

Well Curb Time Analysis , Automatic Re bar Tying Machine Analysis

Model-Well Foundation