CT3000

construction of ramp for entry in hotel building

Gandhinagar Railway and Urban Development Corporation Ltd (GARUD) is a Joint Venture Company incorporated on 5th January, 2017 between Government of Gujarat (GOG) and Indian Railway Stations Development Corporation Ltd (IRSDCL) under the provisions of the Companies Act, 2013 with equity Contribution of 74% from Government of Gujarat (GOG) and 26% from Ministry of Railway (MOR). The authorized equity capital of the company is Rs. 30 Crores. GARUD is entrusted with the task of undertaking the implementation of Gandhinagar Railway Station redevelopment project. It has been mutually agreed between Indian Railways and Government of Gujarat that Gandhinagar Railway Station would be re-developed to international standards by leveraging land/air space around station which shall include development of 5 Star Category 300 rooms hotel on the airspace of the station as well as management of Mahatma Mandir and Exhibition Centre at Helipad Ground for enhanced utilization of these facilities. According to Indian Railways, this Rs. 255 crore Project of the redeveloped Gandhinagar railway station will be India’s “first railway station jeweled with amenities at par with modern airports. So for accessing this hotel building Ramp is created. The project was to be completed in December 2018.
Types of Bridges 1Beam Bridge • Beam bridges are the simplest bridge type normally consists of one or more spans, supported by abutment or pier at each end. Beam bridges are usually constructed of RCC or steel or a combination of both RCC and Steel. The concrete elements used in beam bridges may be reinforced, prestressed or post-tensioned. This is a Girder Bridge with steel Girders • It is designed as One lane 70R loading and two- lane Class A Loading  


Report Content

coverpage

introduction to project

plan of ramp

elevations of ramp

detailed elevations

job layout

introduction to activity

element details

procedure

launching scheme