Mehta Pujal S

CT3000

MUMBAI ELEVATED METRO (LINE 7)

Part Design and Construction of elevated viaduct and 4 elevated stations viz. Andheri Metro (East), Shankarwadi, JVLR Junction & Mahanand (Excluding Architectural Finishing & Pre-engineered steel roof structure of Stations) from chainage (-) 450m to 5801.400m of Andheri (East) – Dahisar (East) Corridor of Mumbai Metro Rail Project of MMRDA. This includes entry/exit structures of the stations. (6.25 Km)


Report Content

PROJECT INTRODUCTION

CASTING YARD JOB LAYOUT

JOB LAYOUT FOR PILE FOUNDATION

CONSTRUCTION METHOD FOR PILE FOUNDATION

BORING ANALYSIS

TIME, MOTION STUDY AND COST ANALYSIS FOR PILE FOUNDATION

JOB LAYOUT FOR PILE CAP

CONSTRUCTION METHOD FOR PILE CAP

COST ANALYSIS FOR PILE CAP

ERECTION OF CONCOURSE GIRDER RENDERED MODEL