Kansara Jaykishan Ketanbhai

CT3000

MUMBAI METRO LINE 3- CBS-UGC-06

MML-3 is a 33.5 KMs long underground corridor running along Colaba-Bandra-SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1 at grade.The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CST, Girgam, Worli, Mahim, Kalina University, Dadar, Bandra, Bandra-Kurla Complex,Santacruz East and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ. This contarct has been awarded to J.KUMAR CRTG JV under Mumbai Metro Rail Corporation Ltd. and it includes “Design and construction of underground sections including three underground station at CSIA Domestic Airport, Sahar Road and CSIA International Airport and associated bored tunnels.” of total length 4.221km along.


Report Content

INTRODUCTION

SITE LOCATION

CASTING YARD UTILISATION PLAN

MOULD FIXING- LAYOUT PLAN

PRECAST SEGMENT WORK SCOPE

SEGMENT DETAIL

MOULD DRAWING

RE-BAR CAGE REINFORCEMENT DRAWING

SEGMENT PRODUCTION-CONSTRUCTION SEQUENCE

ANALYSIS