For a richer surfing experience on our website, please update your browser. Update my browser now!
The aim of our Ward Level Infrastructure Design Studio was to study the current and existing infrastructure facilities of a ward in Ahmedabad and identify gaps and give proposals to bridge these gaps. My focus area was the transportation system of Chandlodiya ward for which I have done the literature study, various surveys and analysis. It was observed that Chandlodiya lacks adequate pedestrian facilities.Chandlodiya has four major junctions, out of which I did a detailed analysis of Damru Junction as it has the most number of accidents and other issues and came up with proposals to solve them.