For a richer surfing experience on our website, please update your browser. Update my browser now!
Study of various infrastructural services provided by the urban local body to its citizen began with the selection of ward. The ward Chandlodiya is selected based on population growth rate and quality of water supply system and sewerage network/system.Literature review, formal and informal interviews and site visits oriented the working methodology of this project. My scope of work was limited to the analysis of the existing water supply system using water gems software and preparing a lake development plan along with its costing.