Vishwakarma Manjeet

CM4001-1

ICONIC COMMERCIAL BUILDING

This project was developed under the Integrated Construction Practice (ICP) Studio, applying BIM and Lean methods for an Iconic Commercial High-Rise Building consisting of 3 basements and 29 floors. The studio focused on defining EIR, preparing a detailed BEP, and developing LOD 300–400 discipline-wise BIM models for coordination, clash detection, and model validation. Model-based QTO, 3D site layout planning, 4D sequencing, and 5D cost simulation strengthened decision-making and performance analysis. Last Planner System–based weekly tracking improved workflow reliability by identifying and removing constraints. Overall, the studio demonstrated how integrated BIM + Lean practices enhance coordination, reduce waste, and improve project delivery.


Report Content

Project Introduction

Studio Role and Revit Model

QS & Risk Analysis

Employer Information Requirement (EIR)

ICP Studio Goals & Action

Bim Execution Plan

ICP Bim Process Map

LOD - LOS

Model Element Authority & Lod – Los Matrix

Conclusion

Project Video