The study is based on a major commercial building project located in Gandhinagar, Gujarat. Designed as a high-rise structure with multiple basements and extensive office spaces, the project operates under an Item Rate Contract with a total construction timeline of 3 years. The development involves complex structural systems and dense MEPF service integration, making it an ideal candidate for BIM implementation. The total estimated financial scope for the construction is approx. ?394 Crores. For the purpose of this academic simulation, specific zones including the substructure and ground floor were selected for detailed modelling and analysis to address critical challenges in logistics and sequencing. Beginning with Stakeholder Alignment to identify potential risks and define the Employer Information Requirements (EIR), which culminated in a robust BIM Execution Plan (BEP). In the Design Development phase, we aligned model maturity (LOD) with the construction schedule (LOS) and utilized the Last Planner System (LPS) to track design deliverables. This foundation allowed for rigorous Design Coordination, where automated clash detection and resolution strategies were employed to eliminate conflicts between Architecture, Structure, and MEP trades. Moving into pre-construction, we generated accurate Construction Quantification (QTO) and Bills of Quantities (BOQ) directly from the federated models. To ensure execution efficiency, the workflow included Site Logistics Planning with Path of Travel (POT) optimization, followed by 4D Phasing to visualize the construction sequence and identify delays. Finally, Cost Integration (5D) and Earned Value Analysis (EVA) were performed to monitor financial health, demonstrating a complete "Concept-to-Control" digital construction workflow.