THE URBAN-RISE

“The Urban Rise” is a G+19 commercial high-rise, featuring offices, showrooms, and three basements, built on a 5,250 sq.m plot with a project cost of 500 crores. Key topics included RII-based challenge identification, BIM Goals and Uses, BEP-guided collaboration flows, LOD–LOS alignment, multidisciplinary LOD 300–400 modelling, clash detection, and site layout optimization using Path of Travel analysis. Integrating BIM tools with lean construction methods establishes a coordinated digital framework that improves accuracy, enhances collaboration, and reduces waste. This approach strengthened the design delivery timeline and model element clarity while optimizing site processes and minimizing movement and material waste, ultimately enabling more efficient and reliable project delivery.


Report Content

Project Brief

Level of Development & Level of Schedule

Project Challenge Intervention

Look Ahead Schedule & 4D Simulation

Use Case Scenario

4D-Simulation for Use Case Scenario

4D-Simulation for Use Case Scenario

5D Simulation

Earned Value Analysis

Conclusion

Project Video