Shah Sahil Jigarkumar

CM4001-2

THE URBAN-RISE

“The Urban Rise” is a G+19 commercial high-rise, featuring offices, showrooms, and three basements, built on a 5,250 sq m plot with a project cost of 500 crores. Key topics included RII-based challenge identification, BIM Goals and Uses, BEP-guided collaboration flows, LOD–LOS alignment, multidisciplinary LOD 300–400 modelling, clash detection, and site layout optimisation using Path of Travel analysis. Integrating BIM tools with lean construction methods establishes a coordinated digital framework that improves accuracy, enhances collaboration, and reduces waste. This approach strengthened the design delivery timeline and model element clarity while optimising site processes and minimizing movement and material waste, ultimately enabling more efficient and reliable project delivery.  


Report Content

Project Introduction

Level of Development and Level of Schedule

Quantity Takeoff Structure Elements(LOD 300)

Quantity Takeoff Mechanical Elements

Project Challenge Intervention

Scope of Work for Last Planner System

PPC Tracking Planned vs Actual (Week 1 to Week 3)

4D-Simulation Tracked Activities

4D-Simulation Tracked Activities and Constraint Mapping

Conclusion

Project Video