Mythri L

BE4003

IDL Lab and WBD | Monsoon Semester '25

The Whole Building Design 2025 studio focuses on improving energy efficiency and lowering carbon emissions through an integrated use of passive and active strategies. For this project, a commercial building (Club 07, Bhopal, composite climate) was first modeled as an ECBC 2017–compliant standard case, which provided the baseline Energy Performance Index and system sizing against which all improvements were evaluated. The final proposed design was developed by iteratively optimizing daylight, the envelope, mixed?mode operation, and a combined VRF–chiller HVAC system, while checking economic viability at each step through capital and operating cost analysis. Performance was assessed using EPI, peak loads, unmet hours, hourly to annual electricity use, and feasibility of passive options, followed by integration of on?site solar PV and a life?cycle assessment of embodied and operational carbon. The resulting Super ECBC case for 2025 achieves a significantly lower EPI (22%) while around 6% reduction in grid electricity demand, demonstrating that deep energy savings, comfort, and strong financial returns can be achieved simultaneously in a high?performance commercial building.


Report Content

Standard case Performance and load Analysis

Climate Analysis

Daylight Optimization and compliance reporting

Envelope optimization

HVAC system selection and Sizing

HVAC optimization and Detailed HVAC controls

HVAC optimization and Energy conservation measures

Renewable energy Integration

Cost-Benefit analysis and Life cycle assessment

Summary