  • PRETENSION U-GIRDER WITH RECT. PIER & OPEN FOUNDATION

Nehul Pokharna

SD4005

PRETENSION U-GIRDER WITH RECT. PIER & OPEN FOUNDATION

This project involves the design of a 24-meter span pretensioned U-Girder bridge in Jaipur, supported on rectangular piers with open (slope) foundations. The design considers regional conditions such as Seismic Zone II classification and high wind velocities. A detailed analysis was conducted using grillage modeling in STAAD, accounting for construction stages and various load effects. Key aspects include girder flexure and shear design, strand profiling with initial prestress loss assumptions, and stress checks under different loading scenarios. The substructure—including pier cap, pier, and foundation—was designed for strength, serviceability, and stability, ensuring a safe and durable bridge structure.

View Additional Work

Report Content

Design Specification;Field review;literature review

General Arrangement Drawing

Static Check;Girder Property;Required Strands according to assumed loss

Stress Summary

Shear and Flexure Design of Girder;loss Summary

Deck Analysis and Design

Diaphragm Analysis and Design

Pier cap Analysis and Design

Pier Analysis and Design

Foundation Analysis and Design