For a richer surfing experience on our website, please update your browser. Update my browser now!
In the stepwell, as one descends through the steps toward the well, the noise from outside gradually fades away. A similar sound gradient was observed on the site, with louder conditions near the road and quieter conditions toward the lake, which informed the built form and its placement. Divided across two levels, the building sinks into the ground, using steps to descend downward as earth acts as a sound barrier, creating a gradual transition from more active spaces above to calmer, introspective spaces below. Its profile is shaped in relation to the existing trees, whose presence helps filter sound and define the form, establishing a reciprocal relationship between the building and the site. A central courtyard and light wells bring ventilation and filtered light into the lower levels, while buffer spaces further soften the transition between active and quiet zones.
View Additional Work