Sanigdha

LA4010

REWILDING THE RESIDUE

The project explores the ecological restoration of a sand-mined landscape along the Sabarmati River in Karai, Ahmedabad. Shaped by extraction, altered terrain and disrupted water systems, the site becomes a testing ground for landscape-led recovery. 
Retaining the site's existing topography, the project reconnects fragmented water infrastructures, reimagining an existing drain as a seasonal stream through terrain-sensitive interventions, slope stabilisation and water management. 
Through phased restoration, planting mosaics and carefully designed pathways, the landscape evolves over twenty years. 
Rather than creating a conventional park, the project allows the landscape to regenerate on its own, where water, soil, vegetation and human access coexist in an ongoing process of ecological recovery.
Disclaimer: Student academic work based on AMC data. This is not an official plan, project, or proposal. 

View Additional Work

Report Content

The project imagines how an excavated landscape can evolve over twenty years through slope stabilisation, water retention and vegetation succession. Rather than creating a finished park, interventions establish the conditions for the landscape to gradually regenerate on its own

Through Sabarmati Riverfront, Vastrapur Lake and Dharoi Reservoir, the study examines how water-related developments reshape landscapes and surrounding communities. It questions the social and spatial consequences of transforming water landscapes in the name of urban improvement.

Located along the Sabarmati River at Karai, the site reflects a landscape shaped by extraction, infrastructure and changing land use. Historical imagery and site observations reveal its transformation from a vegetated landscape to exposed mining terrain, highlighting its potential for ecological regeneration.

Existing contours, slope gradients and drainage patterns form the basis of the design framework. Mapping these systems identifies areas requiring intervention, water-retention potential and terrain that can remain undisturbed, allowing the design to work with the site's existing landforms.

Different slope conditions demand different stabilisation approaches. From retaining exposed steep slopes to introducing coir logs, stone lines, grass matrices and vegetation pockets, interventions slow runoff, retain soil and support gradual ecological recovery without reshaping the existing terrain.

The regeneration plan introduces a network of pathways, water-retention areas and ecological interventions across the existing terrain. These interventions establish the initial conditions for restoration, allowing water movement, vegetation establishment and ecological succession to progressively shape the landscape.

The sections demonstrate how slope-specific interventions respond to erosion and runoff. Surface roughness, organic accumulation, contour interventions and native vegetation work together to stabilise soil and initiate ecological succession across the altered terrain.

The sections explore how ecological interventions and selective access coexist across the site. Vegetation bands, depression pockets and stone lines respond to water movement, while the elevated walkway allows people to experience the terrain with minimal disturbance to the ground.

The landscape changes with seasonal water movement. Monsoon runoff collects within existing depressions, creating temporary wetlands and riparian habitats, while pathways and vegetation respond to fluctuating water levels. During drier seasons, exposed ground and grasslands reveal an alternate landscape condition.

The visualisations explore a possible future where vegetation, water and terrain gradually reshape the extracted landscape. The project leaves the scars of extraction visible while creating conditions for ecological renewal, allowing the landscape to evolve rather than remain a fixed design.