• Home
  • FD
  • CD4005
  • The Long Pause - An ecological nesting infrastructure

Gupta Abhay Chandrashekar

CD4005

The Long Pause - An ecological nesting infrastructure

Set along the edge of Pong Dam Lake, this project proposes a vertical ecological habitat that rethinks the relationship between architecture and non-human life. Instead of occupying the ground, the intervention minimizes disturbance by concentrating activity vertically through a cluster of additively manufactured nesting towers. Fabricated using large-scale concrete 3D printing, the system integrates species-specific nesting cavities, perching zones, and environmental gradients based on height, sunlight, and exposure. The layered printing process allows controlled surface roughness, embedded cavities, and material efficiency difficult to achieve through conventional construction. Acting as an artificial geological extension of the lakeside terrain, the towers merge ecological sensitivity, computational design, and robotic additive manufacturing into a long-term habitat infrastructure for migratory and resident bird species.


Report Content

Problem Statement | Existing Solution

Case Studies | Inference

KPI Parameters | Construction System Comparison

Site Study

Threats and Opportunity | Bird Species Study

Concept | Design Exploration

Design Development | Analysis

Drawings | Cluster Planning

G-code | Concrete Printing

Visualization | 3d Model

Project Video