Feeuna Alam

RE4001

One Pool, Two Waves

The studio asked us to build a development platform rather than read one: raise? 250 crore once, deploy it twice across six projects in one West Ahmedabad corridor, and return it with a number that holds. The structure is a HoldCo treasury over six projects, two held directly and four in ring-fenced SPVs, with a 10% development fee and residual carry. Wave 1 returned? 393.86 crore and retained? 179.64 crore, which funded Wave 2 at Q13 to Q15. Investor and firm together took? 1,381.29 crore on? 250 crore. What stayed with me is that the returns are modelled, not realised.


Report Content

THE INVESTMENT STRUCTURE One HoldCo treasury over six projects, two held directly and four in ring-fenced SPVs, across a single West Ahmedabad corridor. Investors put in ?250 crore of mirror redeemable NCDs, OCDs and equity. Gota at ?100 crore and Shilaj at ?25 crore sit in the HoldCo directly; Ambli-Bopal, the medical plaza, SBR and SG Highway sit in SPVs with their own series. Wave 1 is funded from investor cash, ?150 crore across three vehicles plus ?100 crore at Gota, and Wave 2 from recycled cash, ?250 crore rolled at Q13 to Q15. The page also sets the waterfall, with a cost share, capped interest at 22% and 18%, then a 10% fee and residual; the three levels of tax, at 25.17% in the SPV, 25.17% at HoldCo on fee income only and 10% TDS for the investor; and the price ladder, from ?7,510 a square foot at Gota to ?15,500 at SBR. Residential is 54.4% of GDV, commercial 45.6%.

SIX PROJECTS, ONE CORRIDOR 528 units and 27.57 lakh square feet of saleable area, ?3,535.61 crore of GDV, ?2,375.88 crore of developer revenue and ?298.70 crore of profit after tax. Gota is 3 and 4 BHK at ?7,510 a square foot, 168 units, ?446.97 crore of GDV and 1.37 times. Shilaj is retail and office, ?164.64 crore at 1.77 times. Ambli-Bopal is 4 and 5 BHK sky villas at ?13,500, ?314.80 crore at 1.63 times. Science City is a medical plaza, ?306.70 crore at 1.78 times. SBR is twin towers at ?15,500, ?1,162.50 crore at 2.06 times. SG Highway is corporate floors at ?13,103, ?1,140.00 crore at 1.99 times. Land is 41.8% of the ?1,765.17 crore programme cost, but only ?123.63 crore was ever paid in cash, and only at Gota. The other five came as 60:40 or 65:35 joint development, so ?615.03 crore of land was paid in product. Of the GDV, ?1,159.73 crore, or 32.8%, is the landowner's share and never reaches the developer line.

RETURNS, TIMING AND EXPOSURE Investor XIRR runs from 19.9% at Shilaj to 41.5% at SBR. Wave 1 blends 21.95% and Wave 2 40.98%, because the same ?250 crore is deployed twice: Wave 1 returns ?393.86 crore and retains ?179.64 crore, which funds Wave 2 at Q13 to Q15. Across the portfolio the investor gets back ?900.05 crore and HoldCo retains ?481.24 crore, ?1,381.29 crore in all, or 2.60 times on ?250 crore. Every project returns more than 1.3 times capital, and the two Wave 2 towers return about 2.0 times. The page then names the four exposures the portfolio carries to Q25: timing, since 65% of GDV exits in Q25; concentration, since all six sites sit in one micromarket; landowner share, since 32.8% of GDV is paid in product; and absorption, since Gota sells 28 flats a quarter while Ambli-Bopal's 42 sky villas take twelve quarters to clear.

LEARNING OUTCOME Where value comes from, read against the other two studios. The six forces run across the top: rules, access, land and deal, capital, cost and build, market and exit, with value sitting beyond them as decided before the drawing. Under that sits the chain that connects them, from site and rules through to return and exit. Then three columns, four lessons each. Finance: buyers carry the build, return is real, the assumption is the risk, rules hold the cash. Firm Analytics: read the firm and not the headline, growth is not profit, scale is not return, look outside the P&L. Strategy: value is decided early, one pool two waves, return has a band, sequence the fee. The inference the page lands on is that the three studios agree on one thing, which is that the number that breaks a model is the assumption nobody tested.