Navya Elsa Binu

UM4004

Reading the Neighborhood: Usmanpura

This Urban Management Studio 2026 project assesses Usmanpura, a 75-ha, 75,051-resident area of Ahmedabad's West Zone, shaped by the 1460 Saiyad Usman Dargah, Ashram Road and the 2022 metro station. It reviews land use, housing, transport, waste, water, stormwater and sewerage, with focus on sewerage. Findings: 100% sewer coverage and 97.5% collection efficiency, but ageing, undersized pipes, stormwater mixing, no tertiary treatment (237 MLD untreated), only 20% of complaints closed within 24 hours, and public-toilet gaps. Services reach nearly everyone, but quality, coordination and data remain weak.


Report Content

Site Context: Usmanpura, Ahmedabad: a 75-ha historic riverside neighbourhood, anchored by the 1460 Saiyad Usman Dargah and now shaped by Ashram Road, civic offices and the metro.

Sector Overview: Land use, housing, transport and solid waste: services reach most residents, but open space, affordable housing and last-mile systems fall short of norms.

Governance and Water Systems: How Ahmedabad's water and sanitation are funded, governed and linked, from traditional stepwells to the AMC-run grievance system.

Water, Sewer and Stormwater Networks: Source-to-outfall view of the three networks: piped supply, gravity-based sewerage and stormwater drainage, with clogging and unmapped cross-connections as key issues.

Sewer Network Mapping: Gravity-fed, fully underground sewer system with 100% connectivity; the sewer route within the site remains unpublished.

Field findings: broken lines, missing manhole covers, stormwater-sewer mixing, uneven public toilets and a sewer network of small, old pipes.

Stakeholder Perspectives: Officials, residents and workers describe the same system differently, revealing gaps in toilets, pipe capacity, maintenance and complaint resolution.

Performance Assessment (Collection): Sewage generation, collection efficiency and complaint redressal measured against MoHUA benchmarks: coverage is strong, but only 20% of complaints close within 24 hours.

Performance Assessment (Treatment): Treatment adequacy, effluent quality, reuse and cost recovery: about 237 MLD goes untreated to the Sabarmati, with no tertiary treatment.

Initiatives and Conclusion: Planned upgrades (a larger Vasna STP, tertiary treatment, sludge management, trench rehabilitation) and a priority matrix ranking all eight sectors by urgency.