Satwik Suraj

UI4001

Festive Waste management of Ahmedabad

This pilot aims to strengthen Ahmedabad’s Ganeshotsav waste management by transforming immersion sites into organised recovery points. It connects event planning, safe kund operations, source segregation, material sorting, transportation and verified recovery through two practical SOPs, supported by digital monitoring. By clarifying responsibilities, improving coordination and prioritising worker safety, the initiative seeks to ensure that festive materials are handled responsibly and that the efforts of communities and sanitation workers lead to measurable environmental outcomes.

View Additional Work

Report Content

Studio Overview and Project Introduction

The analysis highlights gaps between existing collection practices and verified material recovery, establishing the need for a coordinated, measurable and recovery-oriented approach through the pilot.

A seven-stage approach connects sectoral analysis, site assessment and feasibility with lessons from other cities to develop a practical, material-specific recovery framework for Ahmedabad’s festive waste.

Spatial analysis of immersion activity identifies high-demand zones and potential locations, while accessibility, available space, recovery proximity and water safety guide the selection of a feasible pilot site.

Mapping and field observations reveal the concentration of immersion activity, uneven access to kunds and recurring waste hotspots, highlighting the need for better site-level planning, segregation and collection.

Field observations identify waste composition, collection challenges, worker-safety concerns and gaps in material handling, informing six practical interventions to strengthen segregation, recovery and accountability.

The two SOPs translate identified gaps into practical actions, linking material-specific handling, safe kund operations and event-wide coordination with measurable recovery and post-event accountability.

The proposed governance structure clarifies stakeholder responsibilities, while stage-wise costing, funding options and milestone-based payments establish a transparent and accountable approach to pilot implementation.

The SOPs establish a clear rhythm for event preparation, kund operations and post-event review, supported by worker incentives, fair corrective measures, routine maintenance and digital monitoring to ensure continuous improvement.

The proposed digital platform connects field operations with real-time tracking, while measurable indicators and risk controls support safer work, verified recovery and informed decisions for future scaling.

Project Video