• Home
  • FP
  • UI4001
  • TARAI: A New Water Source for Construction Sites

Pankaj Mangesh Ranawade

UI4001

TARAI: A New Water Source for Construction Sites

TARAI, an alternative source of water for construction sites in Ahmedabad, is being studied for its use of treated wastewater. A tanker based supply system will be set up to transport treated wastewater from selected sewage treatment plants to the construction sites nearby. The project aims to reduce groundwater dependence, promote reuse of wastewater and arrive at a practical solution for the growing demand of water for construction sites in the city.

View Additional Work

Report Content

Project Overview: Introduction to Ahmedabad’s water supply system and the key challenges in the sector

Project Introduction: Background, problem identification, project aim, objectives and scope

Project Components and Methodology: Overview of the proposed system, project methodology and relevant case studies

Existing Situation and Gap Assessment: Construction growth, water demand, site observations and gaps in the existing supply system

Project Proposal: Introduction to the treated-water supply concept and identification of potential STP sources

Proposed Pirana Pilot: Assessment of STP locations, water quality suitability and the proposed pilot infrastructure

Demand and Cost Assessment: Estimation of construction water demand, tanker requirements and borewell costs

Financial and Institutional Framework: Assessment of treated-water delivery costs, project expenditure and institutional responsibilities

Impact and Implementation: Environmental impact, phased implementation strategy and risk assessment

Conclusion: Summary of the project findings and the need for more responsible and sustainable water use

Project Video