This project asks which rapid transit system suits Surat's corridors and how it can be built. It reviews 14 Indian metro DPRs against actual ridership, studies Nagpur Metro Phase 2 in detail and draws lessons from New York's integrated network. Following the Metro Rail Policy 2017, five systems are screened on eight weighted criteria and the top two scored in detail; Medium Metro ranks first on all three corridors, with BRTS as feeder. The project then covers CBTC signalling, an environmental impact assessment of four lines with a ?57.64 crore EMP, and a 60-month, ?18,120 crore implementation plan.


Report Content

Where my work sits in the studio's three stages, and the five parts of this portfolio.

Surat today: the growth hubs, economy and transport network a metro must connect.

Nagpur Metro Phase 2 studied in detail, and 14 Indian metro DPRs compared with actual ridership.

New York as an international benchmark, and my four-step method with eight weighted criteria.

Corridor 2, Udhna Darwaja to Sachin: site reading and ranking of five systems; Medium Metro and BRTS shortlisted.

Detailed scoring on 21 sub-parameters: Medium Metro wins Corridor 2 (80.02 vs 69.78) and both extensions.

CBTC moving-block signalling lets more trains run safely on the same track, at SIL 4.

Environmental impact assessment of four lines, offset by a ?57.64 crore Environmental Management Plan.

Implementation in 60 months for ?18,120 crore, led by a GMRC SPV with UMTA coordination.

Conclusions and learnings: Medium Metro as the backbone, BRTS as feeder, planned with realistic ridership.