Pranjal Hingwe

UT4002

Integrated Multimodal Public Transport for Surat

This studio project prepares an integrated multimodal public transport plan for Surat, following the Comprehensive Mobility Plan, Alternatives Analysis and Preliminary Project Report stages. Starting from best-practice cities and Indian DPR lessons, it builds a calibrated 2027 travel demand model and tests BAU, Compact and Polycentric growth scenarios to 2057. Polycentric growth is selected, with Medium Metro on trunk corridors and BRTS as feeder. The proposal covers alignments, stations, operations, unified fares, environmental impact, costing and appraisal. The preferred TOD-integrated scenario achieves an EIRR of 24.1%, well above the 14% MoHUA minimum.


Report Content

The studio aims to show how to prepare a multimodal integrated public transport project, using Surat as the case. It follows a 9-step framework across three stages (CMP, Alternatives Analysis, DPR), ending in a costed four-line metro plan.

Compares 16 global cities on PT mode share and network length, grouped by operational, physical, information, fare and institutional integration. The key lesson is that integration, frequency and density matter more than network length (Hong Kong has 237 km and a 90% share; Shanghai has 818 km and 41%).

Covers six PT modes tied together by the Octopus card, which is used by 98% of residents and has QR and contactless options at the same fare. Rail-plus-property (land development rights) funds the system. Learning: integration beats size, and one payment layer is essential.

Summarises the 2020 CMP (horizon 2031): vision, study area, metro and road network, land use, trip characteristics, household survey, road upgrades, NMT and parking, and phased funding. Its goals are PT share of 60% or more and cuts in GHG emissions and air pollution.

Shows existing land use, population and employment density, and the road and PT networks. Surat is growing fast eastward, with population projected to rise from 81 to 150 lakh by 2057. It has 128 km of BRTS, 40 km of metro under construction, and 345 km of city bus network.

Defines three growth scenarios for 2057: BAU, Compact and Polycentric. It details the Compact scenario's land use, population density and employment density, with development concentrated around the core and corridors.

Shows auto assignment, desire lines and PT assignment for Compact 2057, plus a BAU/Compact/Polycentric comparison. Compact is the most efficient on paper but impractical for Surat, so Polycentric was selected.

Maps the 96 metro stations (38 under construction, 58 proposed) across the lines, with 7 interchanges. It sets out station area zoning, heights, planning norms (NBC, NFPA 130) and platform sizing criteria by coach formation.

Gives the elevated station layout (concourse, platform and office plans) with legends for each area. It also covers pedestrian access around stations: footpaths, crossings, bus bays, IPT bays, parking and last-mile connections.

Defines AFC and its components, then compares three cities. Surat has a single ticket, single journey system under one SPV. Ahmedabad has three separate operators and fare systems. Pune uses distance-based metro fares (?10–35) with interchange.